INDUSTRY APPLICATION
Xinjiang Urumqi high-speed rail station clean energy heating project is in line with the national policy, to promote wind power consumption, while meeting the local high-speed rail station and surrounding heating needs. The project is located in the high-speed rail new district of Urumqi, Xinjiang. It is the largest wind power consumption heating demonstration project in China, mainly addressing the heating needs of scattered building areas and hard-to-reach areas of thermal pipe networks or natural gas pipeline networks. The first phase of the project is equipped with six 8mw electrode boilers and nine 1100 cubic meters of thermal storage tanks. The installed wind farm has an installed capacity of 250,000 kilowatts and a heating area of 430,000 square meters. It can cover the underground space and long-distance passenger transportation of the North Square of Urumqi Station. Stations and buildings such as the High Speed Rail Service Center. With the successful operation of the pilot project of the first phase of electric heating and abandoning wind heating in Urumqi, it will be further promoted in the future. In the second phase, there will be electric heating in the south square to abandon the wind and heat, and finally extend to the entire high-speed railway station square.
Boiler room and auxiliary equipment room covers an area of 382 square meters, length 36m, width 10.45m, the total height of the second floor is 11m, of which the first floor is the boiler unit (including pump, plate replacement, local control) Wait). The second floor is water supply equipment, heating water pump, control room, etc.
The non-burning, non-emission environmentally friendly electric boiler used in this boiler room is powered by 10KV power supply. The boiler room in the boiler room is 2m wide from the wall, and the plate changing pump (Finnish Commas KOLMEKS) has a 2.5m channel from the wall (see picture), as well as the north and south sides of the boiler house. It can be used here as a circular display channel. (At the same time of running the heating system, show the principle of wind power consumption and related scientific knowledge, introduce the principle of electric boiler, the principle of thermal storage system, automatic control system, etc., as a demonstration of electric energy substitution and popular science demonstration.)
Commes from Finland is the world's leading manufacturer of pumps and motors. Founded in 1945, it has 70 years of industry experience and has consistently provided stable, reliable and efficient products to customers around the world.
Combes affiliated with the Brant Group, as a family-owned company, has been actively developing the Chinese market since coming to China in 2003, and has established three large-scale production bases in Europe in Maanshan and Zhangzhou. This also brings it to eight production sites around the world, located in Finland, Estonia, the United States and China.